Objective:
To revamp the aging sewer infrastructure in the Herat Industrial Zone, enhancing waste management and environmental protection.
Project Overview:
Zaman Aryoub Wal Plastic Pipe Company played a pivotal role in the rehabilitation of the sewer system serving the Herat Industrial Zone. The project involved the replacement of old, corroded pipes with high-strength HDPE pipes to support better waste management and reduce contamination risks.
Details:
• Products Used: Corrosion-resistant HDPE pipes for long-term sewer application.
• Scope of Work: Provided HDPE pipes, assisted in installation planning, and conducted pressure and leakage tests to ensure system efficiency.
• Outcome: The new sewer infrastructure has significantly improved waste management, reduced the environmental impact of industrial waste, and enhanced the area’s hygiene and sanitation standards.